Sprint history
What this is
A reconstruction of how ManpowerIQ was built, organised by feature, not by ticket number. It draws on the 71 development reports under manpoweriq/docs/ (the MIQ*_Report.md, Sprint*, PB*, UM*, and A* series). Each theme page summarises what shipped, the key decisions, and links to the fact sheet and concept/reference pages.
Dev MIQ-IDs are not sprint-plan row numbers
The development reports use their own MIQ-NNN numbering, which does not line up with the master sprint-plan row IDs. The same feature may carry different numbers in the two systems (e.g. the dev equalization work ≠ the plan's Equalization epic row range). These pages therefore map work by feature; treat any MIQ-NNN here as a pointer to the dev report, not a sprint-plan reference. Where a report and the code disagree, the code (and the Phase-0 fact sheets) win.
Timeline (by feature, roughly chronological)
| Era | Theme | Principal dev reports |
|---|---|---|
| Foundation | Foundation & platform | MIQ-103, 003, 004, 005, 105; UM-01–06; A1, A2 |
| Core data | Employee master | MIQ-006, 007, 008, 009, 010; A5, A10, A12 |
| Core data | Calendars & shifts | MIQ-011, 013, 014 |
| Engine | Allocation engine | MIQ-021–026, 029, 031 |
| Engine | Demand planning | MIQ-016 |
| Engine | Rosters & runs | MIQ-027, 075, 080, 121 |
| Workflow | Approvals & publish | MIQ-035, 036, 015; RosterPublishApproval |
| Workflow | Leave | MIQ-030, 030a |
| Workflow | Cross-pooling | pool & lending work (sheets 12/22) |
| Operations | Attendance | Sprint 10a, 10b; MIQ-051 |
| Fairness | Equalization | MIQ-024, 028; Sprint 11 |
| Admin | Lookups & admin CRUD | MIQ-131, 132, 133 |
A later UI/UX polish pass (MIQ-160) and the monthly roster calendar (MIQ-121) refined the surface after the core features landed.
How to read these pages
Each theme states build status honestly — what is LIVE, what is PARTIAL, and what was scoped but not built (carrying the Phase-0/3 findings). The chronology is reconstructed from report content, not assumed from numbering.
Related
- Polish backlog — open items + the F1–F9 findings.
- Fact sheets
_factsheets/(excluded from the build) — the verified per-feature source.